Quick Options
Kanal
Prices last updated on
28th March, 2023
Total Cost
1.80 Crore
Grey Structure Material Cost
1.50 Crore
Labour Cost
30.30 Lakh
Price Per Sq Ft
2,862
Breakdown of Grey Cost By Percentage (PKR)
- Foundation & Structure 1.61 Crore
- Plumbing Works 15.67 Lakh
- Electrical Works 3.94 Lakh
Foundation & Structure
Foundation & Structure includes materials for the basic house structure including foundation, floors, walls, roofing, and plastering.
1.61 Crore
Bricks, Cement, Sand, & Crush
1.02 CroreRoof Insulation, Termite & Water Proofing
1.90 LakhExcavation & Steel Reinforcement
31.65 LakhLabor Cost
25.52 LakhPlumbing Works
Plumbing works include underground piping and drainage systems materials.
15.67 Lakh
Cold and Hot Water Supply
1.57 LakhInsulation Armaflex
1.06 LakhDrainage System Piping
3.32 LakhGas Piping
2.05 LakhPumps and Drains
3.29 LakhAC Drainage System
47.60 ThousandUPVC Pipeline for Sewerage System
1.14 LakhLabor Cost
2.77 LakhElectrical Works
Electrical works include underground wiring and all electrical items.
3.94 Lakh
Switches and Back Boxes
47.88 ThousandConduits & Accessories
1.44 LakhLabor Cost
2.02 LakhDisclaimer
This cost is for 1 Kanal double storey House. All the information in this calculator is published for general information purpose only. All product prices
are subject to change according to the market fluctuation and may not be 100% accurate.
Construction Cost Calculator
Want to learn more about Zameen.com’s Construction Cost Calculator and build your dream house?
- Flexibility of Area Size and Units
- Separate Estimates for Grey Structure and Complete House
- Multiple Construction Modes
- Flexibility to Change the number of rooms
Frequently Asked Questions (FAQs)
What is the cost of building 1 Kanal house grey structure in Lahore?
What is the grey structure rate in Lahore?
What is included in the grey structure?